WebBuilding inspector Fred Lonardo discusses rough mechanical and framing inspections.SUBSCRIBE to This Old House: http://bit.ly/SubscribeThisOldHouse.Kevin O’C... WebBelow deck insulation is recommended to be installed prior to frame inspection. Refer to building plans for details and energy compliance forms identifying insulation method. ...
Building Framing Inspection Checklist - Austin, Texas
WebROUGH FRAME: Inspection of all structural and non-structural components are in place. This inspection is made after the roof, framing, fireblocking, firestopping, draftstopping and bracing is in place and the structure is weather tight. ROUGH LOW VOLTAGE: All electrical boxes in place, electrical cables or raceway installed and all boxes bonded. The first phase of the inspection is the semi-structured one. At this stage, the house will have the doors and windows already installed. One must examine hundreds of items literally before framing inspection. Here is your chance to look at structural objects, point loads, walls, bracing, and fire blocking before the … See more At this point, your plumbing, both vent, water and gas lines, will be installed. It is here that we install all hot-water pipes, cold-water pipes, and gas lines for equipment. Despite an initial leak test, these pipes are … See more Electrical lines are run after HVAC and plumbing. Through the layout of pipes, connector boxes, cabling and electrical panel installation, … See more This is the rough-in inspection of every mechanized part that will be hidden in the construction. Before closing up the system again, must run some … See more microwave cleaning hack
Requirements for Electrical Inspector Checkpoints - The Spruce
WebBrick Ties: This is done to check spacing of brick ties and can be done with other Inspections prior to installation. Plumbing Rough-In Inspection: This is done after the above ground plumbing (water and drainage piping) is installed, prior to the framing inspection (10 feet head water test or 5 PSI air test is required). WebROUGH FRAMING INSPECTION CHECKLIST D Check for treated seal plate D Anchor bolt spacing per approved plans D 6” min distance from plywood sheathing to Earth D Trusses per City Stamped Approved Truss Calculations D Lateral support joist/rafter D Roof framing per plan/Roof nail D Notching and boring at Studs, Top Plates, Floor Joists D Floor nail WebA rough framing inspection is the first part of a four-way inspection during a building or house construction. It should be done or requested after the plumbing and heating system have been roughed in and before installing the insulation. There are a hundred and one items the inspector will look for during the framing inspection but the most ... microwave cleaning hack lemon juice